Client: Rise GmbH
Installed capacity: approx. 2.1 MW
Two expert reports were prepared for the financing of the rehabilitation measures and the energetic use of the ecological flow
1. expert report on revenues to assess the basis and assumptions for energy production, marketing and production costs of the existing and new power plant.
2. expert report on the asset value and tangible assets of Rise GmbH to supplement the expert report on the revenue. It is prepared on the basis of the ImmoWertVO 2020.