Hydropower plant Nalubaale (Owen Falls) & Kiira, river Nile, Lake Victoria, Uganda

Client: UEGCL (Ugandan Electricity Generation Company Limited), Uganda
KfW Development Bank
Installed capacity: Naalubale 180 MW / Kiira 200 MW

Definition and tendering of the required engineering services for a feasibility study to examine the possibilities of operation and rehabilitation measures so that the plants can continue to be operated safely for the next 30 years. In particular for the Nalubaale power plant, which shows considerable damage due to the alkali-silicate reaction of the concrete.

To all references
Skills

Posted on

29. July 2021

Submit a Comment

Your email address will not be published. Required fields are marked *