Client: Bavarian Water Authority Weilheim, Bavarian State Office for Environment.
Feasibility study for raising the dam by 3m including the necessary adaptation measures to German Standards DIN 19700 (installation of a new inner seal, a drainage and monitoring system incl. inspection gallery.
To all references