Client: Bavarian Water Authority Weilheim
The flood protection project on the Kanker and Loisach rivers to protect Garmisch-Partenkirchen consisted of 4 projects. For 3 of these projects. the flood retention basin for the Kanker (V= 220,000 m3), the urban waterway extension of the Kanker and the underground flood diversion (L=3,300m, Q=97m3/s) the design, tendering and construction supervision were carried out.
To all references