Client: Iraq Ministry of Water Recourses
A feasibility study should evaluate if and how the dam and the envisaged hydropower plant (130 MW) can be completed and if the dam height can be increased to 90 m to ensure greater safety of downstream residents (Mosul, Baghdad, etc.) in case of failure of the Mosul Dam.