Flood retention reservoir 1 – Schwäbisch Gmünd/Reichenhof Rems

Client: Wasserverband Rems

Design, tendering and construction supervision for the construction of flood retention reservoir 1 in the Rems valley. The retention volume of 615,000 m3 is controlled by a 3-field, structure with an ecologically continuous passage under the main gate.

To all references
Skills

Posted on

30. July 2021

Submit a Comment

Your email address will not be published. Required fields are marked *